Pumping Station

Area: Ashdod

Project Value: 40 Million

Status: Finished

Israel

Water jacking management, including the production process: defining the required tests for the manufacturing plant piping, holding preliminary meetings with the factory, auditing production and labeling, and in addition, performing, tracking, and closing open issues of defects during plant manufacturing, controlling the protocols of storage and maintenance for equipment used at the site, writing a test protocol for water jacking, performing experimental and control sections of pipe jacking procedure, and high-level supervision.