Performing piles drilling in the 4th railway in Ayalon Road of various diameters and lengths was the first step in expanding the Ayalon Highway.
Ensuring the drainage of the Ayalon River canal and arranging access routes to and from outside the canal.
Email - info@oghandasa.com
Phone - +972-74-7015130