Archives

Office building – 30,000 sqm The planned project is the construction of an office building for Israel Railways. The project is for an area of about 30,000 square meters, a building of typical office floor plans of about 2,200 square meters, and development work around the office building and parking lots. OG Engineering will manage the quality control system for… View Article
Ashkelon Hospital Professional Clinic for Clalit Health Fund. A structure with three floors that will serve as a Professional Clinic, one of its many services is an advanced X-ray facility.
Office building Train facility structure for the Israeli railway company. The project is composed of several buildings and structures. The whole purpose of this project is to provide services for trains; from preserving day-to-day treatments to fueling, cleaning, and washing, this facility will take care of any train.
Netanya Stadium Netanya Stadium – establishing an urban soccer stadium in Netanya, which includes constructing a stadium building, bleachers, a VIP section, restaurants, changing rooms, and a grass soccer field. Integration of complex construction projects, systems, electricity, finishing works, and decorative lighting.
Office building Ashdod office building – an office building with two floors, including an elevator, security rooms, meeting rooms, and offices. The building is designed for the Israel Water Authority and Mekorot (the National Water System).
Beit Shemesh Bridge Construction of a bridge connecting neighborhoods to allow for increased traffic volume. A replica of the parallel bridge. A cast prestressed concrete bridge. Expected completion – Feb 2021
Depot and Depot Portal The Depot and Depot Terminal project aims to build the operational maintenance center for the red train line and connect it with the tunnels. The project contains: Building the maintenance and operations buildings, infrastructure, concrete walls, development works, electrical and communication systems, rails, and roads
Improvement of Access Road The proposed project is expanding, constructing, and adding road railings to the access road to Eshkolot settlement.  The project includes widening the road on both sides, scrubbing and tarring the road, installing steel rails on the sides, building separation walls, and adding light poles at the junction. OG Engineering conducts Quality Control services for the project.
Highway/Railroad Crossing Separation The project consists of erecting a bridge for North/South traffic over the heavily traveled west entrance to the city and adjacent parallel train tracks to eliminate signaled-level intersections. The 1st phase consists of rerouting conflicting underground utilities, including sewer, water, storm drains, electric, and communication lines, to prepare bridge foundations. The significant challenge is working… View Article
Highway Improvements – Gimzu Junction This project will include broadening, repaving, and arrangements of traffic and drainage at the junction of 443 and 444 and Junction Gimzu. The project will undertake, among other goals, the expansion of road segments on both sides, drainage works, lighting installation, new traffic signals, scrubbing and covering each section, and installation of steel railings on… View Article